Order $24.50 or more to qualify for FREE Shipping on eligible items. (Contiguous 48)

Surecrete DK400 High-Gloss Polyurethane Concrete Floor Sealer - 1 Gallon


About

Surecrete DK 400 solvent-based concrete sealer is a 2 component, 51% solids, acrylic aliphatic polyurethane designed as a non-yellowing clear coating for interior concrete, cement based overlays, or as a top finish coat on epoxy systems. 

This high performance clear top coat provides a balance of strength, UV stability, flexibility, chemical and scratch resistance that is both user-friendly and extremely durable. As a vertical wall coating, it enhances anti-graffiti properties. 

DK 400 is ideally suited for both commercial and residential settings: aircraft hangars, clean room floors, manufacturing facilities, warehouses, bars, clubs, retail stores, automotive showrooms, residential interiors, garage floors, stadiums, or any high traffic area where an exceedingly resilient floor is desired.

Calculator

How many square feet is your project?
NOTE: Coverages provided are based on an average coverage rate of 350 square feet per gallon per coat.

Coats 1 gallons
1 coat
2 coats
3 coats

Specs

  • For professional use
  • Coverage: 300-400 sq. ft. /Gal
  • VOC: 400 g/l
  • Appearance (cured): clear gloss
  • Appearance (wet): clear
  • Application Temperature: 50°F – 90°F (10°C - 32°C)
  • Set to touch: 6-8 hours
  • Ready for light traffic: 24 hours
  • Full cure and hardness: 5 days

Instructions


SURFACE PREP

The principles for surface preparation for Dura-Kote Polyurethane SB are aligned with other coating systems placed on concrete or cement based overlays, the substrate must be:

  1. Clean: The surface must be free of dust, dirt, oil, grease, paints, glues, sealers, curing agents, efflorescence, chemical contaminants, rust, algae, mildew and other foreign matter that may serve as a bond breaker or prevent proper adhesion. To remove coatings, paint, sealers, glue from concrete, etc. best results are achieved through diamond grinding or shot blasting.
  2. Cured: Any concrete must be sufficiently cured to have complete hydration, approximately 28 days depending on temperatures & humidity. Cement based overlays typically cure sufficiently within 2 – 3 days.
  3. Sound: No system should be placed on flaking or spalling concrete or cement based overlay. If the surface is delaminating, or divots are present, diamond grinding, shot blasting, or other mechanical means should be used to remove the delaminating areas. Depending upon size of area, patching may be required prior to application of Dura-Kote Polyurethane SB. Flash Patch or Deep Level is an excellent choice as a patching product to complement the system. Refer to their respective spec. sheets. As a thin mil coating, Dura-Kote Polyurethane SB, will never bridge construction joints in concrete. Large expansive slabs should have planned appropriate flexible caulks to allow for movement.
    Cracks in concrete may likewise require treatment: evaluate crack as static or structural to set expectation of treatment. Refer to spec. sheet on SCT-22 Crack and Spall Treatment.
  4. Profiled:
    • Concrete: For a proper bond, the surface of concrete must be opened up or roughed up to feel like 80 – 180 grit sandpaper. This profile is best accomplished through diamond grinding or shot blasting. Proper profile should follow the standard established by the International Concrete Repair Institute (ICRI) Technical Guideline no. 03732 for Concrete Surface Profile (CSP). The established profile is categorized as CSP-1 through CSP-3. Customarily cement-based overlays do not require profiling.
    • Finish or Top Coat:Screen the preceding coat with a 100 grit sanding screen on a rotational floor machine. This screening will ensure not only a good bond between coats, but also eliminate any debris or dust that may have settled onto the preceding coat as it was curing. Follow screening with vacuuming. Follow vacuuming with a micro-fiber wipe with a solvent such as xylene, acetone, or denatured alcohol. Listed below are some common systems requiring a Finish or Top Coat:
      • Dura-Kote Flakes
      • Dura-Kote Metallics
      • Dura-Kote Pigmented Epoxy 100
      • Dura-Kote Pigmented Epoxy WB
      • Any other Dura-Kote specialty system
  5. Limit Moisture:Since Dura-Kote Polyurethane SB is not vapor permeable and due to the uncertainty of vapor barriers placed beneath concrete, testing prior to application is appropriate.
    • Plastic sheet test (ASTM-D-4263) can often identify excessive moisture vapor transmission. Tape all 4 sides of an 18” (45 cm) square of clear plastic to the slab and leave in place for 16 hours. Any condensation formed or darkening of the slab beneath the plastic indicates the surface is too wet for polyurethane.
    • Calcium Chloride test (ASTM-F-1869) will quantify the amount of moisture that is transmitted to surface of the slab. The moisture measurement is expressed in terms of pounds (kg) per 1,000 ft² (m²) per 24 hours. Measurements that are in excess of 3 pounds per 1,000 ft² (1.4 kg per 100 m²) over 24 hours are too wet for polyurethane. Follow directions of test kit manufacturer.


Note: these observations and measurements may be inherently flawed as they are “snapshots in time”. These tests serve only as guidelines.

TEMPERATURE/CURE

Avoid application on extremely cold or hot days or during wet, foggy weather. Basic rules include:

  • Apply with ambient and surface temperatures ranging above 50°F (10°C) and below 90°F (32°C) and that will remain within ranges for at least 12 hours following application.
  • Surface temperature must be a minimum 5°F (3°C) above dew point.
  • Relative humidity should be below 75%.

Cure Rates @ 77°F (25°C)                     Cure Rates @ 50°F (10°C)

Dry to touch = 6 - 8 hrs.                         Dry to touch = 18+ hrs.

Light traffic = 24 hrs.                              Light traffic = 48 hrs.

Heavy traffic = 3 days                             Heavy traffic = 5 days

Full cure = 5 – 7 days                              Full cure = 14 days


APPLICATION

Planning

  1. Product is flammable, turn off all fuel burning appliances and pilot lights. Be certain there are no potential sources of ignition.
  2. Provide for ventilation so that vapors do not accumulate.
  3. Select appropriate PPE (personal protection equipment). Use of a NIOSH approved respirator is required. Refer to SDS.
  4. Work across the narrowest dimension of an area where practical.
  5. Work to an exit from wet product.
  6. To track coverage rate for each premeasured kit, after establishing room dimensions, before mixing commences, place a short piece of masking tape on the wall to correspond to the “distance” one kit should cover. Product should achieve approximately 300 - 400 ft² per gal. (28 - 37m² per 3.8 liter) 4 - 5.3 mils.

Mask all areas requiring protection; product will stick to just about everything.


Mixing and handling:

  1. Organize mixing station that neither has to relocate, nor block the progress of application. Staging is critical so that Part A and part B are not confused with one another or mixed too far in advance. Once A and B are mixed, the catalyzed product should be placed on the floor within 30 minutes. If left in the pail too long, product will cure at an accelerated rate rendering it useless.
  2. Pour 1 part B into 4 parts A. Note that kits are premeasured for convenience.
  3. Mechanically mix with jiffy style mixer both parts A and B for 2 minutes at medium speed.
  4. Thinning with xylene may be desired especially on 1st coat at approximately 20% (equal to part B) using same mixer at 1 minute.
  5. Transfer contents into an appropriately sized pan or pail equipped with a roller grid.
  6. Do not leave pail upside down to drain onto floor. Any unmixed portion of A or B that may have accidentally been placed onto side of pail can now drain down onto the floor, creating a spot that will not cure.
  7. Clean out or replace mixing pails and mixer blades in a reasonable fashion, so that the chemistry of A and B remain consistent, especially over large projects. An appropriate cleaning solvent is xylene.


First Coat

  1. Select applicator
    • As a thin mil system, most commonly a roller ranging in nap size from mohair to 3/8” (9.5 mm) is appropriate.
    • Rollers should be premium quality with phenolic core.
    • “De-fuzz” roller by wrapping tightly with masking tape and removing tape.
    • As a top coat over Dura-Kote Flakes, a squeegee may be appropriate for spreading prior to back rolling.
    • Large areas may require 18” rollers and wider squeegees.
  2. Saturate roller in pan or pail with roller grid, and remove excess product to prevent excessive dripping. Any drips require rolling out.
  3. Apply product in an area that can comfortably be covered with the material on a wet roller. Before the roller begins to dry out, become tacky and “pull”, backroll the same area.
  4. Saturate roller again and cover another similar size area maintaining a wet edge between the two areas. Large expansive areas will require sufficient manpower and / or appropriately sized rollers to accomplish the wet edge. To illustrate: an area that has dried for 30 minutes will “pull” on the roller as wet product is applied next to it, leaving an unsatisfactory finish. Roller covers will require replacing if pulling or tackiness is observed. Areas of overlap must be wet on wet.
  5. Cut in by brush areas adjacent to walls.

Note: First coat may “stand alone” as a single coat depending upon application selected, or applicator and client choice. First coat may also serve as Finish or Top Coat for several of Dura-Kote specialty systems, some are listed below:

  • Dura-Kote Flakes
  • Dura-Kote Metallics
  • Dura-Kote Pigmented Epoxy 100
  • Dura-Kote Pigmented Epoxy WB
  • Any other Dura-Kote specialty system

Second Coat

If first coat has cured dry to the touch and is no longer tacky (refer to cure rates listed above as a guide) repeat all steps of application listed above. Planning, masking, mixing and handling, and application are identical in second coat.

If first coat has cured beyond 48 hours or if dust or debris has settled into it as it cured, it must be scuffed with a rotational floor machine equipped with a black pad or a 100 grit sanding screen. Follow scuffing or screening with vacuuming. Follow vacuuming with a micro-fiber wipe with a solvent such as xylene, acetone, or denatured alcohol. Proceed with second coat as described above.

Sacrificial Coat

A sacrificial coat is not required, but will add further protection to the finished product. SureFinish provides a protective sacrificial coat, a measure of slip resistance, and is available in gloss and matte, as a simple mop on product.

See More

Surecrete DK400 High-Gloss Polyurethane Concrete Floor Sealer - 1 Gallon

Quantity must be 1 or more
Regular price
$181.95
Sale price
$181.95

The combination of excellent flow-ability and a high-gloss sheen makes DK400 the #1 choice for top-coating 3D metallic epoxy floors in commercial and residential spaces. DK400 lays down like glass and is a great choice whenever your project calls for protecting concrete from chemical or abrasive wear.

  • High-gloss and excellent leveling provide a "glass-like" finish
  • A tough top coat for high-build epoxies
  • High chemical and abrasion resistance
  • Perfect for use in commercial and residential environments
  • Preferred floor coating for restaurants, bars, and commercial kitchens

Attention: Material is considered hazmat, and cannot be shipped air.

About

Surecrete DK 400 solvent-based concrete sealer is a 2 component, 51% solids, acrylic aliphatic polyurethane designed as a non-yellowing clear coating for interior concrete, cement based overlays, or as a top finish coat on epoxy systems. 

This high performance clear top coat provides a balance of strength, UV stability, flexibility, chemical and scratch resistance that is both user-friendly and extremely durable. As a vertical wall coating, it enhances anti-graffiti properties. 

DK 400 is ideally suited for both commercial and residential settings: aircraft hangars, clean room floors, manufacturing facilities, warehouses, bars, clubs, retail stores, automotive showrooms, residential interiors, garage floors, stadiums, or any high traffic area where an exceedingly resilient floor is desired.

Calculator

How many square feet is your project?
NOTE: Coverages provided are based on an average coverage rate of 350 square feet per gallon per coat.

Coats 1 gallons
1 coat
2 coats
3 coats

Specs

  • For professional use
  • Coverage: 300-400 sq. ft. /Gal
  • VOC: 400 g/l
  • Appearance (cured): clear gloss
  • Appearance (wet): clear
  • Application Temperature: 50°F – 90°F (10°C - 32°C)
  • Set to touch: 6-8 hours
  • Ready for light traffic: 24 hours
  • Full cure and hardness: 5 days

Instructions


SURFACE PREP

The principles for surface preparation for Dura-Kote Polyurethane SB are aligned with other coating systems placed on concrete or cement based overlays, the substrate must be:

  1. Clean: The surface must be free of dust, dirt, oil, grease, paints, glues, sealers, curing agents, efflorescence, chemical contaminants, rust, algae, mildew and other foreign matter that may serve as a bond breaker or prevent proper adhesion. To remove coatings, paint, sealers, glue from concrete, etc. best results are achieved through diamond grinding or shot blasting.
  2. Cured: Any concrete must be sufficiently cured to have complete hydration, approximately 28 days depending on temperatures & humidity. Cement based overlays typically cure sufficiently within 2 – 3 days.
  3. Sound: No system should be placed on flaking or spalling concrete or cement based overlay. If the surface is delaminating, or divots are present, diamond grinding, shot blasting, or other mechanical means should be used to remove the delaminating areas. Depending upon size of area, patching may be required prior to application of Dura-Kote Polyurethane SB. Flash Patch or Deep Level is an excellent choice as a patching product to complement the system. Refer to their respective spec. sheets. As a thin mil coating, Dura-Kote Polyurethane SB, will never bridge construction joints in concrete. Large expansive slabs should have planned appropriate flexible caulks to allow for movement.
    Cracks in concrete may likewise require treatment: evaluate crack as static or structural to set expectation of treatment. Refer to spec. sheet on SCT-22 Crack and Spall Treatment.
  4. Profiled:
    • Concrete: For a proper bond, the surface of concrete must be opened up or roughed up to feel like 80 – 180 grit sandpaper. This profile is best accomplished through diamond grinding or shot blasting. Proper profile should follow the standard established by the International Concrete Repair Institute (ICRI) Technical Guideline no. 03732 for Concrete Surface Profile (CSP). The established profile is categorized as CSP-1 through CSP-3. Customarily cement-based overlays do not require profiling.
    • Finish or Top Coat:Screen the preceding coat with a 100 grit sanding screen on a rotational floor machine. This screening will ensure not only a good bond between coats, but also eliminate any debris or dust that may have settled onto the preceding coat as it was curing. Follow screening with vacuuming. Follow vacuuming with a micro-fiber wipe with a solvent such as xylene, acetone, or denatured alcohol. Listed below are some common systems requiring a Finish or Top Coat:
      • Dura-Kote Flakes
      • Dura-Kote Metallics
      • Dura-Kote Pigmented Epoxy 100
      • Dura-Kote Pigmented Epoxy WB
      • Any other Dura-Kote specialty system
  5. Limit Moisture:Since Dura-Kote Polyurethane SB is not vapor permeable and due to the uncertainty of vapor barriers placed beneath concrete, testing prior to application is appropriate.
    • Plastic sheet test (ASTM-D-4263) can often identify excessive moisture vapor transmission. Tape all 4 sides of an 18” (45 cm) square of clear plastic to the slab and leave in place for 16 hours. Any condensation formed or darkening of the slab beneath the plastic indicates the surface is too wet for polyurethane.
    • Calcium Chloride test (ASTM-F-1869) will quantify the amount of moisture that is transmitted to surface of the slab. The moisture measurement is expressed in terms of pounds (kg) per 1,000 ft² (m²) per 24 hours. Measurements that are in excess of 3 pounds per 1,000 ft² (1.4 kg per 100 m²) over 24 hours are too wet for polyurethane. Follow directions of test kit manufacturer.


Note: these observations and measurements may be inherently flawed as they are “snapshots in time”. These tests serve only as guidelines.

TEMPERATURE/CURE

Avoid application on extremely cold or hot days or during wet, foggy weather. Basic rules include:

  • Apply with ambient and surface temperatures ranging above 50°F (10°C) and below 90°F (32°C) and that will remain within ranges for at least 12 hours following application.
  • Surface temperature must be a minimum 5°F (3°C) above dew point.
  • Relative humidity should be below 75%.

Cure Rates @ 77°F (25°C)                     Cure Rates @ 50°F (10°C)

Dry to touch = 6 - 8 hrs.                         Dry to touch = 18+ hrs.

Light traffic = 24 hrs.                              Light traffic = 48 hrs.

Heavy traffic = 3 days                             Heavy traffic = 5 days

Full cure = 5 – 7 days                              Full cure = 14 days


APPLICATION

Planning

  1. Product is flammable, turn off all fuel burning appliances and pilot lights. Be certain there are no potential sources of ignition.
  2. Provide for ventilation so that vapors do not accumulate.
  3. Select appropriate PPE (personal protection equipment). Use of a NIOSH approved respirator is required. Refer to SDS.
  4. Work across the narrowest dimension of an area where practical.
  5. Work to an exit from wet product.
  6. To track coverage rate for each premeasured kit, after establishing room dimensions, before mixing commences, place a short piece of masking tape on the wall to correspond to the “distance” one kit should cover. Product should achieve approximately 300 - 400 ft² per gal. (28 - 37m² per 3.8 liter) 4 - 5.3 mils.

Mask all areas requiring protection; product will stick to just about everything.


Mixing and handling:

  1. Organize mixing station that neither has to relocate, nor block the progress of application. Staging is critical so that Part A and part B are not confused with one another or mixed too far in advance. Once A and B are mixed, the catalyzed product should be placed on the floor within 30 minutes. If left in the pail too long, product will cure at an accelerated rate rendering it useless.
  2. Pour 1 part B into 4 parts A. Note that kits are premeasured for convenience.
  3. Mechanically mix with jiffy style mixer both parts A and B for 2 minutes at medium speed.
  4. Thinning with xylene may be desired especially on 1st coat at approximately 20% (equal to part B) using same mixer at 1 minute.
  5. Transfer contents into an appropriately sized pan or pail equipped with a roller grid.
  6. Do not leave pail upside down to drain onto floor. Any unmixed portion of A or B that may have accidentally been placed onto side of pail can now drain down onto the floor, creating a spot that will not cure.
  7. Clean out or replace mixing pails and mixer blades in a reasonable fashion, so that the chemistry of A and B remain consistent, especially over large projects. An appropriate cleaning solvent is xylene.


First Coat

  1. Select applicator
    • As a thin mil system, most commonly a roller ranging in nap size from mohair to 3/8” (9.5 mm) is appropriate.
    • Rollers should be premium quality with phenolic core.
    • “De-fuzz” roller by wrapping tightly with masking tape and removing tape.
    • As a top coat over Dura-Kote Flakes, a squeegee may be appropriate for spreading prior to back rolling.
    • Large areas may require 18” rollers and wider squeegees.
  2. Saturate roller in pan or pail with roller grid, and remove excess product to prevent excessive dripping. Any drips require rolling out.
  3. Apply product in an area that can comfortably be covered with the material on a wet roller. Before the roller begins to dry out, become tacky and “pull”, backroll the same area.
  4. Saturate roller again and cover another similar size area maintaining a wet edge between the two areas. Large expansive areas will require sufficient manpower and / or appropriately sized rollers to accomplish the wet edge. To illustrate: an area that has dried for 30 minutes will “pull” on the roller as wet product is applied next to it, leaving an unsatisfactory finish. Roller covers will require replacing if pulling or tackiness is observed. Areas of overlap must be wet on wet.
  5. Cut in by brush areas adjacent to walls.

Note: First coat may “stand alone” as a single coat depending upon application selected, or applicator and client choice. First coat may also serve as Finish or Top Coat for several of Dura-Kote specialty systems, some are listed below:

  • Dura-Kote Flakes
  • Dura-Kote Metallics
  • Dura-Kote Pigmented Epoxy 100
  • Dura-Kote Pigmented Epoxy WB
  • Any other Dura-Kote specialty system

Second Coat

If first coat has cured dry to the touch and is no longer tacky (refer to cure rates listed above as a guide) repeat all steps of application listed above. Planning, masking, mixing and handling, and application are identical in second coat.

If first coat has cured beyond 48 hours or if dust or debris has settled into it as it cured, it must be scuffed with a rotational floor machine equipped with a black pad or a 100 grit sanding screen. Follow scuffing or screening with vacuuming. Follow vacuuming with a micro-fiber wipe with a solvent such as xylene, acetone, or denatured alcohol. Proceed with second coat as described above.

Sacrificial Coat

A sacrificial coat is not required, but will add further protection to the finished product. SureFinish provides a protective sacrificial coat, a measure of slip resistance, and is available in gloss and matte, as a simple mop on product.