Order $24.50 or more to qualify for FREE Shipping on eligible items. (Contiguous 48)

Westcoat EC-36 100% Solids Epoxy 3-Gallon Kit


About

EC-36 100% Solids Epoxy is a two-component, medium viscosity, low odor, high-build, chemical resistant epoxy. It is packaged as a Clear (Neutral Base) Epoxy and can be used as either a clear epoxy topcoat or it can be combined with CA-36 Epoxy Color Pack to create a pigmented epoxy, to the desired color of choice.

Specs

  • Package: 2-gallon Part A, 1-gallon Part B
  • Coverage: 250-500 sf/gal as a primer
  • Coverage: 100-300 sf/gal as a coating
  • VOC: 0 gm/l
  • Color: Clear or can be tinted with CA-36 Epoxy Color Packs
  • Mix Ratio: 2:1 by volume
  • Shelf Life: 2 years in unopened packaging

Instructions

Inspection

  • The surface must be structurally sound, clean, dry, and free of grease, paint, oil, dust, curing agents, laitance or any foreign material that will prevent proper adhesion.
  • The concrete should be at least 2,500 PSI and porous or rough enough to allow the product to soak in.
  • A minimum of 28 days curing time is required on all concrete.
  • Prior to starting work, test existing concrete slab for efflorescence, moisture and hydrostatic pressure.


Preparation

  • Pre-cut and clean all cracks and joints with a concrete diamond blade to at least 1/4 x 1/4 inch.
  • Prepare concrete to a profile equal to CSP 3-4 as specified by ICRI.
  • Methods may vary according to the condition and hardness of the concrete.
  • Other factors include the forecasted use of the surface and the environment in which it is to be installed.
  • When preparing the surface use caution when shot blasting, scarifying too aggressively, leaving grind marks or grinding too smooth.
  • Please refer to desired System Specification Sheet for more information on preparation.


Moisture

  • All concrete should be tested for moisture before applying a seamless coating.
  • If moisture emissions exceed 5 lbs/1000 square feet/24 hours (ASTM F1869) or if the relative humidity (RH) exceeds 75% (ASTM F2170), contact the manufacturer before application.


Mixing

  • Premix each component separately.
  • If tinting with CA-36 Epoxy Color Pack, add one 32 fluid ounce unit of CA-36 per 3 gallon kit of EC-36 Epoxy.
  • Mix the entire contents of CA-36 into the EC-36 Part A and mix thoroughly, before combining the Part B.
  • Mix thoroughly with a low speed (400-600 rpm) drill motor for 3-4 minutes.
  • Make sure to scrape the sides and bottom of the container during mixing.
  • After mixing is completed, remove material from container within 5 minutes, as epoxy will begin to generate heat.
  • Spread immediately onto the floor. As product is spread out, you will have longer working time (10-15 minutes at 70°F).


Thinning

  • For use as a primer: EC-36 may be thinned up to 100% with CA-23 or acetone. Typical thinning for use as a primer is 2-4 quarts per 3 gallon kit of EC-36.
  • For use as a coating: EC-36 can be thinned with up to 10-20% CA-23 or acetone, by volume. If thinned, it must be applied thinly enough to allow solvent to escape (minimum 300 square feet per gallon).


Coverage

  • Coverage will vary depending on condition of surface and desired thickness.
  • As a primer: 250-500 square feet per gallon.
  • As a coating: 100-300 square feet per gallon.


Applying Product

  • As a primer:
    • Spray or squeegee and backroll thinned EC-36 onto the surface.
    • Primer coat should be applied evenly and worked into the surface to help seal and avoid pinholes.
    • When thinned, apply EC-36 at a maximum of 5 mils.
    • Do not allow material to puddle.
  • As a coating:
    • Apply EC-36 within 24 hours after the primer coat.
    • Immediately after mixing, spread a strip of material onto the surface along the edges where it will be "cut in" using a brush.
    • Pour the remaining material near the "cut in" area and spread evenly using a trowel or squeegee and back roll using a 1/4" to 3/8" nap, non-shedding roller.
    • A notched trowel or squeegee will help regulate the thickness and a porcupine roller will help to release trapped air and minimize bubbles.
    • Depending on the look, thickness, chemical, and abrasion resistance desired, 1 to 2 coats may be applied.
    • Please refer to desired System Specification Sheet for more information on applying the product.


Dry Time

  • You may re-coat as soon as the surface is dry to touch or in about 9-10 hours.
  • Light foot traffic may be permitted in 12 hours, normal traffic in 24 hours and vehicle traffic in 3 days.
  • All times are based on average temperature of 70°F and 50% humidity.
  • Cooler temperatures will increase drying time.


Clean Up

  • Uncured material should be removed with an environmentally-safe solvent.
  • Cured material should be removed mechanically.


Limitations

  • This product is designed for professional use only.
  • Be sure to measure and mix properly. Be aware of the pot life of mixed epoxy.
  • Do not apply when temperatures are below 50°F or above 90°F. Hot or cold weather will affect dry times.
  • Epoxy must be cured for a minimum of 24 hours before coming in contact with water.
  • Skid resistant additives are available, such as CA-30 or CA-31.
  • For interior use only unless protected by a UV resistant coating.
  • Solvents may be required in cooler weather or lower viscosity and increase coverage of 100% solids.
  • Please check with local laws governing the use of solvents.
  • Do not allow Westcoat products to freeze.
See More

Westcoat EC-36 100% Solids Epoxy 3-Gallon Kit

Quantity must be 1 or more
Regular price
$279.95
Sale price
$279.95

Use this incredibly versatile clear epoxy for industrial seamless floors in manufacturing plants, mechanical warehouses, industrial kitchens, and garages. Use it as a primer coat, Filler coat, broadcast coat, or topcoat.

  • Can be tinted with CA-36 Epoxy Color Packs
  • Clear appearance when mixed straight from the bucket
  • Convenient 2:1 mix
  • USDA/FDA compliant

Attention: Material is considered hazmat, and cannot be shipped air.

About

EC-36 100% Solids Epoxy is a two-component, medium viscosity, low odor, high-build, chemical resistant epoxy. It is packaged as a Clear (Neutral Base) Epoxy and can be used as either a clear epoxy topcoat or it can be combined with CA-36 Epoxy Color Pack to create a pigmented epoxy, to the desired color of choice.

Specs

  • Package: 2-gallon Part A, 1-gallon Part B
  • Coverage: 250-500 sf/gal as a primer
  • Coverage: 100-300 sf/gal as a coating
  • VOC: 0 gm/l
  • Color: Clear or can be tinted with CA-36 Epoxy Color Packs
  • Mix Ratio: 2:1 by volume
  • Shelf Life: 2 years in unopened packaging

Instructions

Inspection

  • The surface must be structurally sound, clean, dry, and free of grease, paint, oil, dust, curing agents, laitance or any foreign material that will prevent proper adhesion.
  • The concrete should be at least 2,500 PSI and porous or rough enough to allow the product to soak in.
  • A minimum of 28 days curing time is required on all concrete.
  • Prior to starting work, test existing concrete slab for efflorescence, moisture and hydrostatic pressure.


Preparation

  • Pre-cut and clean all cracks and joints with a concrete diamond blade to at least 1/4 x 1/4 inch.
  • Prepare concrete to a profile equal to CSP 3-4 as specified by ICRI.
  • Methods may vary according to the condition and hardness of the concrete.
  • Other factors include the forecasted use of the surface and the environment in which it is to be installed.
  • When preparing the surface use caution when shot blasting, scarifying too aggressively, leaving grind marks or grinding too smooth.
  • Please refer to desired System Specification Sheet for more information on preparation.


Moisture

  • All concrete should be tested for moisture before applying a seamless coating.
  • If moisture emissions exceed 5 lbs/1000 square feet/24 hours (ASTM F1869) or if the relative humidity (RH) exceeds 75% (ASTM F2170), contact the manufacturer before application.


Mixing

  • Premix each component separately.
  • If tinting with CA-36 Epoxy Color Pack, add one 32 fluid ounce unit of CA-36 per 3 gallon kit of EC-36 Epoxy.
  • Mix the entire contents of CA-36 into the EC-36 Part A and mix thoroughly, before combining the Part B.
  • Mix thoroughly with a low speed (400-600 rpm) drill motor for 3-4 minutes.
  • Make sure to scrape the sides and bottom of the container during mixing.
  • After mixing is completed, remove material from container within 5 minutes, as epoxy will begin to generate heat.
  • Spread immediately onto the floor. As product is spread out, you will have longer working time (10-15 minutes at 70°F).


Thinning

  • For use as a primer: EC-36 may be thinned up to 100% with CA-23 or acetone. Typical thinning for use as a primer is 2-4 quarts per 3 gallon kit of EC-36.
  • For use as a coating: EC-36 can be thinned with up to 10-20% CA-23 or acetone, by volume. If thinned, it must be applied thinly enough to allow solvent to escape (minimum 300 square feet per gallon).


Coverage

  • Coverage will vary depending on condition of surface and desired thickness.
  • As a primer: 250-500 square feet per gallon.
  • As a coating: 100-300 square feet per gallon.


Applying Product

  • As a primer:
    • Spray or squeegee and backroll thinned EC-36 onto the surface.
    • Primer coat should be applied evenly and worked into the surface to help seal and avoid pinholes.
    • When thinned, apply EC-36 at a maximum of 5 mils.
    • Do not allow material to puddle.
  • As a coating:
    • Apply EC-36 within 24 hours after the primer coat.
    • Immediately after mixing, spread a strip of material onto the surface along the edges where it will be "cut in" using a brush.
    • Pour the remaining material near the "cut in" area and spread evenly using a trowel or squeegee and back roll using a 1/4" to 3/8" nap, non-shedding roller.
    • A notched trowel or squeegee will help regulate the thickness and a porcupine roller will help to release trapped air and minimize bubbles.
    • Depending on the look, thickness, chemical, and abrasion resistance desired, 1 to 2 coats may be applied.
    • Please refer to desired System Specification Sheet for more information on applying the product.


Dry Time

  • You may re-coat as soon as the surface is dry to touch or in about 9-10 hours.
  • Light foot traffic may be permitted in 12 hours, normal traffic in 24 hours and vehicle traffic in 3 days.
  • All times are based on average temperature of 70°F and 50% humidity.
  • Cooler temperatures will increase drying time.


Clean Up

  • Uncured material should be removed with an environmentally-safe solvent.
  • Cured material should be removed mechanically.


Limitations

  • This product is designed for professional use only.
  • Be sure to measure and mix properly. Be aware of the pot life of mixed epoxy.
  • Do not apply when temperatures are below 50°F or above 90°F. Hot or cold weather will affect dry times.
  • Epoxy must be cured for a minimum of 24 hours before coming in contact with water.
  • Skid resistant additives are available, such as CA-30 or CA-31.
  • For interior use only unless protected by a UV resistant coating.
  • Solvents may be required in cooler weather or lower viscosity and increase coverage of 100% solids.
  • Please check with local laws governing the use of solvents.
  • Do not allow Westcoat products to freeze.